UAD 3.6 is replacing 2.6. Dwelling Blocks has delivered 3.6 to UCDP since 2025. See where your pipeline stands →

UAD 3.6 is replacing 2.6. Here is where you stand.

The redesigned URAR replaces every legacy appraisal form with one dynamic report built on structured data. For lenders it is the largest change to collateral since 2011, and it lands in the middle of a live pipeline. This page covers what changes, what Dwelling Blocks already handles, and how to get there before 2.6 retires if your current platform is not ready.

Key dates · Fannie Mae and Freddie Mac

The move to 3.6 is under way.

Nov 2, 2026
3.6 becomes the standard; 2.6 continues under the GSE policy exception
Mar 1, 2027
Freddie Mac: 2.6 reports lose appraised value rep and warrant relief
May 19, 2027
Last day for new 2.6 reports
Jun 27, 2027
Freddie Mac: last day for 2.6 resubmissions

What changes

  • UAD 3.6 is replacing 2.6 for every appraisal submitted to UCDP. Fannie Mae and Freddie Mac are giving lenders that need more time a temporary policy exception, so new 2.6 reports are accepted through May 19, 2027 while the lender moves to 3.6.
  • The date that counts is the initial UCDP submission, not the order date. An appraisal ordered shortly before 2.6 retires, with a normal turn time, can land on the wrong side of the line.
  • On Freddie Mac loans, a 2.6 report submitted from March 1, 2027 gets a collateral risk score of 99 and no appraised value rep and warrant relief. Moving before March avoids that.
  • Freddie Mac accepts resubmissions of existing 2.6 reports through June 27, 2027. From June 28, 2.6 is retired entirely.
  • The 1004, 1073, 2055, 1025, 1004D and the other legacy forms are retired. In their place is one URAR whose sections change with the property type and the assignment, plus a Completion Report and a Restricted Appraisal Update Report. The data is structured, the abbreviations are gone, and delivery is a package (XML, PDF and images), not a single PDF.
  • UCDP has been returning warning messages on 2.6 submissions since August 6, 2026.

Where Dwelling Blocks stands

Delivering 3.6 to UCDP since 2025 · UCDP Direct Integration approved · FHA through EAD
We have delivered UAD 3.6 reports to UCDP since 2025, through the Limited Production Period and into broad production, and to FHA through EAD.
We are approved for UCDP Direct Integration on 3.6. Submissions go straight from the platform to UCDP, and the response comes straight back onto the loan.
Ava reads the redesigned URAR as it is: the dynamic sections, the structured fields, the addenda and the photos. Your rules apply to the new report without a re-mapping project, and 3.6-specific checks are built in.
Appraisers on our network produce 3.6 in their own forms software. We validate the delivery package before submission so a bad file never reaches UCDP.
Each lender turns 3.6 on by product, state or channel, so you can run 2.6 and 3.6 side by side through the transition and see which loans are on which standard in analytics.

What a lender has to have in place

  1. 01Ordering: the platform can order the new URAR and route it to appraisers and AMCs who can produce it.handled today
  2. 02Panel: every appraiser and AMC you use has forms software verified for 3.6 and has delivered live reports.handled today
  3. 03Review: your QC rules and your reviewers work on the new report, not on form numbers that no longer exist.handled today
  4. 04Delivery: UCDP submissions in 3.6 over a direct integration, with the response back on the loan.handled today
  5. 05Pipeline: you know which loans will first submit after 2.6 retires, and you are ordering those in 3.6.handled today
  6. 06Revisions: a path for 2.6 orders and resubmissions until 2.6 retires.handled today
  7. 07Training: underwriters and processors can read the new report.we train your team

Dwelling Blocks handles the first six for you today. We train your team on the seventh.

Live before 2.6 retires

If your platform is not ready, or you do not trust that it will be, we can move you well before 2.6 retires. A migration has a fixed shape and we have run it at national scale. Panel import and AMC connections in week one, the LOS connection in week two, a parallel run on live orders in week three, cutover on a date you choose in week four.

Week 1

Panel import, AMC connections, user setup, rule sets moved into Ava.

Week 2

LOS integration or API connection. Orders created from the loan file.

Week 3

Parallel run on live orders alongside your current platform.

Week 4

Cutover on a date you choose, with your existing pipeline finishing where it started.

Your underwriters keep working in the LOS. Your appraisers keep getting paid. Nothing in your pipeline waits on us.

Four weeks is typical for a lender with one LOS and an existing panel. Larger migrations get a written plan before week one.

Questions we get from lender operations teams

Yes, from November 2, 2026. The lender requests it from Fannie Mae and Freddie Mac and commits to a plan to finish the move to 3.6. With it, new 2.6 reports are accepted through May 19, 2027.

See where your pipeline stands.

Thirty minutes, your current workflow on the screen, and a plain answer about whether you will be ready.

Dates on this page are from the Fannie Mae and Freddie Mac UAD 3.6 timeline and Freddie Mac Bulletin 2026-J: Limited Production September 8, 2025; Broad Production January 26, 2026; mandate November 2, 2026; policy exception for new 2.6 reports through May 19, 2027 and resubmissions through June 27, 2027.